Well, I checked the Openworld order management desk to make sure my onlone order had reached them. Pessimist in this dept' as when I ordered my 2nd line the same way, no-one told the installation desk.
Anyway, they said definatly a provisional install date of the 23rd, pending line test result. Was told that its usually 11 days b4, which put it Friday last.
Keeping me digits crossed. At least I don't have to worry about a dacs box, 'cos I ain't got one according to my local friendly engineer (next door), and he says its copper cable to the junction box at the end of the road.
Anyway, they said definatly a provisional install date of the 23rd, pending line test result. Was told that its usually 11 days b4, which put it Friday last.
Keeping me digits crossed. At least I don't have to worry about a dacs box, 'cos I ain't got one according to my local friendly engineer (next door), and he says its copper cable to the junction box at the end of the road.